功能描述
Use this skill when a solar developer, renewable energy analyst, project finance associate, or EPC engineer needs to draft a pre-development feasibility repo...
使用说明 (SKILL.md)

Solar Project Feasibility Report

Converts site data, resource estimates, and financial assumptions into a DRAFT pre-development feasibility report for a solar PV project — structured to support investment review, offtake negotiations, and permitting preparation.

Flow

  1. Project intake — Collect: site name and location (lat/long or address), land area (acres), state and utility zone, project type (utility-scale / commercial-industrial / community solar), target system capacity (MWac or MWdc, or derive from land area), proposed interconnection voltage level, offtake type (long-term PPA / merchant / behind-the-meter / net metering), and project stage (prospecting / pre-development / development). Ask one topic at a time if the user is unfamiliar with any item.

  2. Resource assessment — Ask for or estimate: typical-year GHI (kWh/m²/day) from NREL PVWatts zone or stated source; DC/AC ratio assumption; estimated annual production (MWh/yr) and capacity factor; performance ratio; degradation rate. Flag any data gap and recommend NREL PVWatts or NASA POWER as free publicly available lookup tools.

  3. System sizing and layout — Summarize: estimated DC capacity, AC capacity, land use efficiency (acres/MWac), array type (fixed-tilt / single-axis tracker), module and inverter technology assumptions, estimated transformer and substation requirements. Note clearly when preliminary engineering has not yet been performed.

  4. Interconnection overview — Document: applicable utility or ISO/RTO (MISO, PJM, CAISO, ERCOT, SPP, NYISO, ISONE, SERTP, or distribution utility), estimated Point of Interconnection, likely study type (SGIP / FERC Order 2023 cluster queue / state interconnection standard), and known congestion or transmission constraint flags. State explicitly that interconnection timelines are a primary schedule-risk factor and queue delays are common.

  5. Permitting and regulatory checklist — Produce a checklist covering: land use and zoning (as-of-right vs. conditional use permit vs. rezoning), state solar ordinance review, FAA Part 77 obstruction review, wetlands and floodplain (CWA Section 404 / FEMA FIRM zone), cultural and biological resources (NHPA Section 106, ESA Section 7), NEPA trigger assessment (federal nexus?), stormwater and SWPPP requirement, building and electrical permits. Mark each item: Not Triggered / Triggered-Low Complexity / Triggered-High Complexity / Unknown.

  6. Financial model highlights — Using stated assumptions, estimate or summarize: capex ($/Wdc), annual O&M ($/kWac-yr), applicable ITC or PTC rate under the Inflation Reduction Act, MACRS 5-year depreciation, debt/equity split assumption, WACC, PPA rate or merchant price assumption, simple payback, LCOE ($/MWh), unlevered IRR, and NPV. Label every number PRELIMINARY ESTIMATE based on user-provided inputs — not investment-grade analysis.

  7. Risk and deal-killer flags — Rate each dimension: interconnection queue depth (Low/Medium/High), permitting complexity score, land control status (Owned / Leased / Optioned / None), grid curtailment risk, offtake creditworthiness, community opposition risk, site contamination flags, wildfire or flood hazard zone, and title and encumbrance status. Flag any deal-killer level item immediately with a recommendation to resolve before advancing.

  8. DRAFT report assembly — Produce the feasibility report with: executive summary, project overview table, resource and production summary, system design summary, interconnection path narrative, permitting matrix, financial highlights table, risk matrix, open-questions list, and data-gap register. End with an unsigned developer/analyst review block.

Key Rules

  • Never present financial figures as investment-grade without a full project financial model — always label numbers PRELIMINARY ESTIMATES.
  • Never characterize interconnection queue position as confirmed without noting that FERC Order 2023 timelines are uncertain and subject to study outcomes.
  • Never confirm wetland, ESA, or NHPA clearance — always state that a qualified environmental consultant must perform the survey.
  • Ask one topic at a time when the user is missing data. Do not halt the entire workflow for a single unknown — flag it and continue.
  • If the user provides a PPA rate or LCOE target, use it as an anchor and explicitly note whether preliminary numbers are consistent with it.
  • The permitting checklist is a starting point only — local jurisdictions vary materially. Recommend a zoning attorney or permitting consultant for project-specific advice.
  • Never advise on specific tax structures or credit monetization strategies — recommend a tax equity counsel.

Output Format

SOLAR PROJECT FEASIBILITY REPORT — DRAFT
Project: [Name] | Location: [Location] | Date: [Date]
Prepared for: [Developer/Analyst] | Stage: [Stage]
DRAFT — Preliminary Estimates Only. Not investment-grade. For developer review.

EXECUTIVE SUMMARY
[3–4 sentences covering scale, resource quality, financial viability flag, and top risk]

1. PROJECT OVERVIEW
[Table: Capacity | Location | Type | Stage | Land Area | POI | ITC/PTC Rate]

2. RESOURCE ASSESSMENT
[GHI | Capacity Factor | Annual Production | Source | Assumptions]

3. SYSTEM DESIGN SUMMARY
[Capacity | DC/AC Ratio | Array Type | Land Use Efficiency | Equipment Assumptions]

4. INTERCONNECTION PATH
[Utility/ISO | Study Type | Estimated Voltage | Timeline Risk Flag]

5. PERMITTING MATRIX
[Permit | Triggered | Complexity | Notes]

6. FINANCIAL HIGHLIGHTS
[Table: Capex | O&M | ITC | LCOE | Payback | IRR | NPV — all labeled PRELIMINARY]

7. RISK MATRIX
[Risk | Level | Mitigation Path]

8. OPEN QUESTIONS AND DATA GAPS
[Numbered list with recommended next step for each]

REVIEW BLOCK
This DRAFT feasibility report is a pre-development analysis aid.
All financial estimates are preliminary. Permitting and interconnection determinations
require licensed professional review.
Developer/Analyst: ________________ Date: ________

Feedback

Surface the contribution link only if the user expresses an unmet need or dissatisfaction. Direct them to: https://github.com/archlab-space/Open-Skill-Hub/issues

安全使用建议
Before installing, treat the generated reports as preliminary business analysis only. The skill itself appropriately warns that financial, tax, engineering, environmental, permitting, and interconnection conclusions require qualified professional review before capital commitments.
能力评估
Purpose & Capability
The stated purpose, README, changelog, and SKILL.md are coherent: they guide an agent to collect solar project inputs and draft a preliminary feasibility report with explicit limitations.
Instruction Scope
Runtime instructions stay within report preparation, data-gap handling, and professional disclaimers; no prompt overrides, hidden behavior, credential use, or unrelated actions were found.
Install Mechanism
The package contains only markdown files with matching metadata hashes, no executable scripts, dependencies, installers, or package hooks.
Credentials
The skill does not require filesystem, network, browser profile, session, or credential access; references to public lookup tools and a GitHub feedback link are proportionate to the workflow.
Persistence & Privilege
No persistence mechanism, background process, privilege escalation, local indexing, or mutation authority is present.
如何使用
  1. 确保已安装 OpenClaw(本地或 Docker 部署)
  2. 在对话框中输入安装命令:/install solar-project-feasibility-report
  3. 安装完成后,直接呼叫该 Skill 的名称或使用 /solar-project-feasibility-report 触发
  4. 根据 Skill 的参数说明提供必要输入,即可获得结构化输出
版本历史
v0.1.0
Initial release. Drafts a pre-development solar PV project feasibility report covering resource assessment, system sizing, interconnection path, permitting checklist, and preliminary financial metrics.
元数据
Slug solar-project-feasibility-report
版本 0.1.0
许可证 MIT-0
累计安装 0
当前安装数 0
历史版本数 1
常见问题

Solar Project Feasibility Report 是什么?

Use this skill when a solar developer, renewable energy analyst, project finance associate, or EPC engineer needs to draft a pre-development feasibility repo... 它是一个面向 Claude Code / OpenClaw 的 AI Agent Skill 插件,目前累计下载 53 次。

如何安装 Solar Project Feasibility Report?

在 OpenClaw 或 Claude Code 对话框中运行命令「/install solar-project-feasibility-report」即可一键安装,无需额外配置。

Solar Project Feasibility Report 是免费的吗?

是的,Solar Project Feasibility Report 完全免费,采用 MIT-0 许可证,可自由下载、安装和使用。

Solar Project Feasibility Report 支持哪些平台?

Solar Project Feasibility Report 跨平台运行,可在任意部署了 OpenClaw / Claude Code 的环境中使用(cross-platform)。

谁开发了 Solar Project Feasibility Report?

由 devasher(@archlab-space)开发并维护,当前版本 v0.1.0。

💬 留言讨论