/install broadband-grant-application-drafter
Broadband Grant Application Drafter
Converts project facts — applicant information, service area, technology choice, deployment timeline, and cost estimates — into a structured grant application narrative for federal and state broadband funding programs. Outputs a DRAFT for applicant, engineering, and legal counsel review before submission.
Flow
Ask one question at a time. Wait for the user's answer before moving to the next step.
Step 1 — Program Identification
Ask:
- Which grant program is this application for? (e.g., BEAD, USDA ReConnect Round 4+, E-Rate, FCC Emergency Connectivity Fund, state broadband office program — specify state and program name)
- What is the application deadline?
- Is this a subgrantee application (to a state broadband office) or a direct federal application?
Look up the program's key eligibility requirements based on the user's answer and state them explicitly before proceeding. Flag any eligibility questions that the applicant must confirm:
- BEAD: Applicants must be ISPs, utilities, cooperatives, local governments, or non-profits; fiber is the default technology; locations served must be confirmed unserved or underserved per the NTIA Fabric
- ReConnect: Applicants must be entities providing service to rural areas with fewer than 400,000 people that are currently unserved (less than 25/3 Mbps or no service)
- E-Rate: Applicants must be eligible schools or libraries; funding is for connectivity and equipment, not infrastructure build-out
Step 2 — Applicant Profile
Collect:
- Legal entity name and type (ISP, co-op, municipality, tribal government, non-profit, etc.)
- State of incorporation / organization
- FCC Registration Number (FRN) and SAM.gov registration status
- Years of broadband deployment experience and any prior federal or state broadband grants received
- Current service territory (states and counties served)
Step 3 — Service Area Definition
Collect:
- Geographic area to be served (county, census tracts, or specific communities — name and state)
- Number of locations to be served (locations, not households; BEAD uses the NTIA Fabric definition)
- Confirmation of unserved / underserved status for the proposed locations:
- Source used (NTIA Fabric, FCC National Broadband Map, state challenge data, or independent survey)
- Current maximum download/upload speeds available at these locations
- Any anchor institutions in the service area (schools, libraries, healthcare facilities, public safety)
If the applicant has not confirmed unserved/underserved status against program-required data sources, flag this as a prerequisite that must be resolved before drafting the application narrative.
Step 4 — Technology Selection
Collect:
- Proposed technology (fiber-to-the-premises FTTP, fixed wireless access FWA, hybrid fiber-wireless, cable, other)
- Planned download / upload speeds to be delivered (must meet program minimums — confirm against the program identified in Step 1)
- Scalability: can the network be upgraded to 1 Gbps / 1 Gbps symmetric without replacing the core infrastructure?
- Last-mile topology and middle-mile access plan
For BEAD applications: confirm that fiber is proposed or document the specific technical justification for an alternative technology under the program's exception process.
Step 5 — Deployment Plan
Collect:
- Phase structure: how many deployment phases, what geography per phase, and why this sequencing
- Milestone schedule: key milestones with estimated dates (engineering complete, permits obtained, construction start, service activation, project closeout)
- Permitting strategy: make-ready process, pole attachment, ROW coordination, tribal land considerations
- Workforce plan: in-house versus contracted construction, workforce development commitments if required by program
Step 6 — Cost Structure
Collect:
- Total project capital cost (estimated)
- Cost per passing (total capex ÷ total locations to be served)
- Cost breakdown by category: construction (civil, trenching, aerial, make-ready), materials (fiber, electronics, CPE), engineering, permitting, project management, contingency
- Operating costs: Year 1 O&M estimate
- Matching funds: amount, source, and confirmation status (committed vs. anticipated)
- Grant amount requested
Flag if cost per location appears outside the typical range for the technology type and geography — ask the user to confirm or provide a justification narrative.
Step 7 — Affordability and Adoption Plan
Collect:
- Subscriber pricing plan: monthly rate for qualifying broadband service at program-required speeds
- Low-income affordability program: participation in ACP successor program, Lifeline, or state equivalent; description of reduced-rate offering
- Digital equity measures: device access programs, digital literacy partnerships, community outreach plan
- Adoption barrier analysis: which populations in the service area face barriers beyond physical access (cost, devices, skills)
Step 8 — DRAFT Narrative Assembly
Assemble the DRAFT application narrative using the Output Format below. Label clearly:
DRAFT — Requires Applicant, Engineering, and Legal Counsel Review
Program: [program name]
Applicant: [legal entity name]
Date: [date]
Flag any information gaps with [INFORMATION NEEDED — DO NOT SUBMIT WITH THIS PLACEHOLDER].
Key Rules
- Always identify and state the specific grant program's eligibility rules before drafting narrative sections.
- Never present cost estimates as binding, certified, or final — always label them "PRELIMINARY ESTIMATES."
- Always confirm the applicant's SAM.gov and FRN registration status is current before drafting — unregistered applicants cannot receive federal funds.
- Never assert that locations are unserved or underserved without the applicant confirming the data source and program-required methodology.
- Always flag BEAD fiber-first requirements; do not draft an alternative-technology justification without the applicant providing the specific technical basis.
- Always include an affordability / adoption plan — it is required by BEAD and most state programs.
- Always label the output DRAFT and include a reviewer sign-off block.
- Ask one question at a time; intake may span multiple sessions.
- This skill produces a narrative draft only — it does not submit to any portal, generate FCC Form filings, or interact with any government system.
Output Format
Produce a structured Markdown document with the following sections:
# Broadband Grant Application Narrative — DRAFT
**Program:** [program name]
**Applicant:** [legal entity name]
**Application deadline:** [date]
**Status:** DRAFT — Requires Applicant, Engineering, and Legal Counsel Review
**Prepared:** [date]
---
## Executive Summary
[3–5 sentence overview: who the applicant is, where the project is, how many locations will be served, what technology will be deployed, and what the total project cost and grant request are.]
## Section 1: Applicant Qualifications
[Narrative: legal entity, type, years of experience, prior grants, current service territory, relevant technical capacity.]
## Section 2: Project Area and Need
[Narrative: geographic area, number of unserved/underserved locations, current speed availability, data source and methodology used to confirm unserved/underserved status, anchor institutions.]
## Section 3: Technical Approach
[Narrative: technology selected, planned speeds, network architecture, scalability to 1 Gbps symmetric, middle-mile access plan.]
*For BEAD applications: fiber-first confirmation or alternative-technology exception justification.*
## Section 4: Deployment Plan
[Narrative: phased deployment timeline, milestone schedule table, permitting strategy, workforce plan.]
### Milestone Schedule
| Milestone | Target Date |
|-----------|-------------|
| Engineering complete | |
| Permits obtained | |
| Construction start | |
| 25% locations activated | |
| 50% locations activated | |
| 100% locations activated | |
| Project closeout | |
## Section 5: Project Budget
[Narrative: total project cost, cost per location, cost category breakdown, matching funds source and status.]
### Budget Summary
| Category | Estimated Cost |
|----------|---------------|
| Civil construction | |
| Materials (fiber, electronics, CPE) | |
| Engineering and design | |
| Permitting and ROW | |
| Project management | |
| Contingency (recommended 10–15%) | |
| **Total Project Cost** | |
| Less: Matching Funds | |
| **Grant Amount Requested** | |
*All figures are PRELIMINARY ESTIMATES. Final costs must be validated by a licensed engineer and reviewed by legal counsel before submission.*
## Section 6: Affordability and Adoption Plan
[Narrative: subscriber pricing, low-income program participation, digital equity measures, adoption barrier analysis, community outreach plan.]
---
## Open Items and Information Needed
[List all [INFORMATION NEEDED] placeholders with responsible party and due date.]
## Reviewer Sign-Off
| Role | Name | Date | Initials |
|------|------|------|----------|
| Applicant Authorized Official | | | |
| Network Engineer | | | |
| Grant/Legal Counsel | | | |
*This narrative is a DRAFT. Do not submit to any grant portal or share with the funding agency until all open items are resolved and all sign-offs are obtained.*
Feedback
If this skill did not meet your needs or you encountered a workflow it does not cover, share your feedback at: https://github.com/archlab-space/Open-Skill-Hub/issues
Surface this link only when the user expresses an unmet need or dissatisfaction — never in normal interactions.
- 确保已安装 OpenClaw(本地或 Docker 部署)
- 在对话框中输入安装命令:
/install broadband-grant-application-drafter - 安装完成后,直接呼叫该 Skill 的名称或使用
/broadband-grant-application-drafter触发 - 根据 Skill 的参数说明提供必要输入,即可获得结构化输出
Broadband Grant Application Drafter 是什么?
Use this skill when an ISP, rural electric cooperative, municipality, tribal organization, or broadband office needs to draft a grant application narrative f... 它是一个面向 Claude Code / OpenClaw 的 AI Agent Skill 插件,目前累计下载 38 次。
如何安装 Broadband Grant Application Drafter?
在 OpenClaw 或 Claude Code 对话框中运行命令「/install broadband-grant-application-drafter」即可一键安装,无需额外配置。
Broadband Grant Application Drafter 是免费的吗?
是的,Broadband Grant Application Drafter 完全免费,采用 MIT-0 许可证,可自由下载、安装和使用。
Broadband Grant Application Drafter 支持哪些平台?
Broadband Grant Application Drafter 跨平台运行,可在任意部署了 OpenClaw / Claude Code 的环境中使用(cross-platform)。
谁开发了 Broadband Grant Application Drafter?
由 devasher(@archlab-space)开发并维护,当前版本 v0.1.0。